Woodriver Drive NSSP Project Status
October 13, 2023~
We have previously reported on the coming Neighborhood Street Safety Program (NSSP) project along Woodriver Drive. This project has created a 6-foot wide sidewalk with raised curbing, starting in front of Woodriver Park and connecting to the existing sidewalk near McClellan Road. At the bottom of the hill near the park, the road pavement has been narrowed to help slow traffic.
Work on the project is mostly complete. The road is now open to traffic though there is still some equipment present and some signage installation and cleanup still needs to be done.
Posted in City News